U.S. Data-Center Construction Costs Climb
Quartz reports U.S. data-center construction costs rose 13% in 2026, with AI facilities about 10% more expensive than traditional facilities and advanced builds at $14–16/W. Labor and utility-connection constraints are cited as drivers; a projected slowdown to 6–10% is a forecast, and the available figures lack project-level breakdowns.
Sources (2)
Updated Nov 21, 2026